Rönesans Holding A.Ş. - Nakkaş toll-road construction PPP project, Türkiye

The Black Sea Trade and Development Bank (BSTDB) is considering providing financing to Rönesans Holding A.Ş, part of which will be utilised for the delivery of the Nakkaş toll-road construction PPP project. The Project constitutes a section of the Northern Marmara Motorway ("NMM") which spans over the Asian and European sides of the wider Istanbul and Marmara regions, providing an alternative transit route bypassing the existing traffic, increased due to the growing population and economic activity. The road will have a total length of 30.64km including connection roads and the 1,619m long Sazlıdere cable stayed bridge. The section to be constructed as part of the Project is expected to provide a corridor between the heavily congested urban areas of Istanbul and increase connectivity from these areas to the wider NMM network.

As per the BSTDB’s Environmental and Social Policy and Public Information Policy, the Project, due to its scale, has been screened as environmental and social (E&S) Category A. This requires a full Environmental and Social Impact Assessment (ESIA) process, including meaningful public consultation, and public disclosure. The Nakkaş PPP project is at an advanced construction stage, has undergone an ESIA process and has already passed public consultation and disclosure through the EBRD and project websites. 

Notwithstanding previous disclosures, BSTDB is publishing the E&S information relevant to the Project on its webpage. Such information will be available for at least 60 calendar days for public sector operations before the Project is submitted to the BSTDB Board of Directors for consideration. Thus, any stakeholder directly or indirectly affected by the Project, or having an interest in it, can review such information, make enquiries, and provide comments. This, however, does not substitute for the obligation of the Client to identify stakeholders affected by, or interested in the Project, and communicate with them in a meaningful way.

The following documents are available for public review and comments:

  • Environmental and Social Impact Assessment (ESIA) Report and its annexes 
  • Non-Technical Summary of the ESIA (NTS)
  • Environmental and Social Management and Monitoring Plan (ESMMP)
  • Environmental and Social Action Plan (ESAP)
  • Stakeholder Engagement Plan (SEP)
  • Resettlement Action Plan (RAP)
  • Guide to Land Acquisition and Compensation (GLAC)
  • Environmental and Social Management Plans of the EPC Contractor including:
  • Construction Environmental and Social Management Plan (CESMP)
  • Biodiversity Action Plan (BAP)
  • Air Quality and Emission Control Plan
  • Blasting Management Plan
  • Waste Management Plan
  • Wastewater Management Plan
  • Landscape Management Plan
  • Noise and Vibration Management Plan
  • Pollution Prevention Plan
  • Traffic Management Plan
  • Community Health, Safety and Security Plan
  • Emergency Preparedness and Response Plan
  • Cultural Heritage Management Plan
  • Supply Chain Management Plan
  • Gender Action Plan
  • Labour Management Plan
  • Health and Safety Plan  

 

The disclosure package in English is available for download here

The disclosure package in Turkish is available for download here

For more detailed information regarding the ESIA of Nakkaş toll-road construction PPP project and any public enquiries related to it, please contact: