Parau 2 Solar and BESS storage Project
Romania | Utilities- Identification Code:
- OP/25/0011
- Total Operation Cost:
- 229.175.000 EUR
- Maturity:
- 216 months
- Operation Status:
-
BSTDB Approved Amount – Approval Date50.000.000 EUR – 02 Apr 2026
-
BSTDB Signed Amount – Signed Date30.100.000 EUR – 12 Aug 2026
-
Status:Active
- Description and Purpose of the Operation:
- The Black Sea Trade and Development Bank (BSTDB) is providing a EUR 30.1 million long-term loan to support the development of Parau 2, a large-scale solar and battery energy storage project in Brașov County, Romania. The BSTDB financing forms part of an approximately EUR 229 million package provided by a consortium of six lenders. Developed by Econergy, Parau 2 will combine a 342 MWp solar photovoltaic power plant with a 150 MW co-located battery energy storage system. The battery system will allow electricity generated on site to be stored and dispatched when the grid needs it, supporting the integration of renewable energy and improving the flexibility of Romania’s electricity system.
- Countries of Operation:
- Romania (100,00%)
- Financial Product:
- Loans
- Sector:
- Utilities
- Domain:
- Private
- Borrower/Client:
- Heliowin SRL (Romania) - the special purpose vehicle (SPV) established to implement the Project.
- Co-Financers/Participants:
- EBRD, Exim Banca Românească S.A., NLB d.d., OTP Bank Plc and Banca Comercială Intesa Sanpaolo România together with its subsidiary Privredna banka Zagreb d.dEBRD, Exim Banca Românească S.A., NLB d.d., OTP Bank Plc and Banca Comercială Intesa Sanpaolo România together with its subsidiary Privredna banka Zagreb d.d
- Guarantors/Sponsors:
- Sponsor: Econergy
- Developmental and Regional Cooperation Impact:
- The operation will have a positive developmental impact on the Romanian economy, both during the installation and more so during the operation of the investment. It will increase and improve electricity supply in Romania, which in turn can support business activity, generate tax revenues and create employment. Additionally, it will increase the share of “green” electricity production in Romania, and open more space to export to neighboring countries. Once operational, the project is expected to increase Romania’s renewable electricity generation capacity, reduce greenhouse gas emissions and support the reliability of the national power system.
- Environmental Classification and Impact:
- The project is classified as Category “B” with minor to moderate E&S risks typical for such solar energy developments. There will be no physical displacement, and potential negative impacts on local communities, pollution (air, ground, and water), biodiversity, and occupational health and safety are assessed and manageable throughout the project lifetime. Overall, the Operation will have a positive E&S impact due to its climate mitigation benefits.
- Operation Leader:
- Energy & Infrastructure
- E-mail:
- ei@bstdb.org
As of 31 Oct 2026